Reinertsen NWR
Мурманск, www.reinertsen.com/murmansk
Строительство, недвижимость, эксплуатация, проектирование... Показать еще
Инженер-конструктор трубопроводов для нефтяных платформ / Piping engineer
Functions:
- 3D modellling of pipes in PDMS
- Preparation of ISOs in Spooler
- Prefab and installation packages for EPCI and TCM projects
- Sideman check of ISOs and prefab/installation packages prepared by piping engineers
- Materials ordering in SAP and negotiation with suppliers
- Remodelling of old pipes according to the scan cloud and new standarts.
Achievements: Participation in big Norwegian oil and gas projects, as Heimdal and Troll B. Positive reviews from the project leaders.
Обязанности:
- 3D дизайн трубопроводов в программе PDMS
- Cоставление и проверка чертежей трубопроводов
- Составление рабочих упаковок (prefab, installation)
- Заказ материалов в SAP
- Ремоделлинг старых трубопроводов в соответствии с новыми стандартами и требованиями
Результаты: участие в крупных норвежских проектах (Heimdal, Troll B), положительные отзывы о результатах работы от руководителей проектов
Participation in following projects:
Mongstad Upgrade
February, 2017 - present time
- Remodeling of old pipes in PDMS
- Production of ISOs
- Production of prefab and installation packages in MIPS
INOVYN project Stenungsund
October, 2016 - December, 2016
- Modeling of equipment (tanks, vessels, pumps) according to the layouts, general arrangement drawings and Nawisworx model
Njord Remodelling project
December, 2015 - October, 2016
- Remodelling of pipes in PDMS for Njord platform. Alignment the pipes with scan (Cloudworx, Navisworx)
Mongstad Unit 800 EPC project
June, 2015 – December, 2015
- Editing ISOs with new mark-ups, so that the spools should be adjusted on site.
- Export components to MIPS.
- Compilation of the prefab packages.
Erstatte klammer med nytt rør hot oil project
February, 2014 – January, 2015
- Design of new seal pot instead of corroded one in PDMS.
- Tie-ins determination and design of connected pipes in PDMS.
- Changing of existing P&ID.
- Production of ISOs and prefab package for the replacement of hot oil pipes. Materials order.
Nytt MEG filter project
August, 2013 – December, 2013
- 3D design of pipes for new MEG filters; production of ISOs; export components in MIPS and creation of prefab and installation packages.
Korrosjon og def. ventiler sealpotte project
September, 2013 – February, 2014
- Design of seal fluid reservoir in PDMS and determination of tie-in points location according to the survey report.
Tjelbergodden
April, 2013 – July, 2013
-Remodeling of pipe lines in PDMS.
Heimdal Remodelling project:
November, 2012 – April, 2013
-Remodeling pipe lines in PDMS based on existing drawings in accordance with governing documents. Positioning of model according to the laser scan clouds.
Troll B Corroded Pipes project:
April, 2012 – November, 2012
- Piping design of the platform Troll B.
- Creating of new ISOs instead of old for damaged pipes.
-Creating of fabrication and installation work packages in MIPS, SAP.
TCM
February, 2012 – March, 2012
-Fabrication Record Books (FRB) compilation, familiarization with MIPS.