4 units Compressor Station, Kazakhstan-China Gas Pipeline
Responsible for the successful field implementation of Rolls Royce Energy projects at customer facilities and is accountable for the safe and quality installation of the packaged systems delivered to the customer.
Acting as a primary site manager responsible for the on-site performance of field service representatives and technical engineers and Health Safety & Environment (HS&E) execution plans and policy applications for the project based on the as sold scope and project location.
Ensure the equipment is installed to the contract specifications and in accordance with Rolls-Royce quality processes and procedures as well as build a strong working relationship with the customer's site representative.
Provide a single point of contact for the field execution of Rolls Royce equipment installation and commissioning activities
Acting as a site manager, lead and undertake the receipt, installation, commissioning and testing of Rolls-Royce packaged Gas Turbine and driven equipment.
Complete and submit field issues notices to ensure any technical or parts issues are recorded and monitor progress on resolution
Report and track cost for the site installation and commissioning phase and identifying opportunities to bring added value items
Close out projects and obtain project acceptance/sign off from the customer
Delivering a complete and professional handover of the project to the Long Term Service Agreement (LTSA) team and/or Customer service team.
Ноябрь 2009 — Октябрь 2010
1 год
“General Electric” Power Services
Аксай (Казахстан), www.ge.com
Operation & Maintenance Manager Advisor
The Advisor has the scope to inform and guide Customer on all O&M activities follow GE procedure and practice.
The advice given on day by day need to be discussed with Customer Plant Manager and need to be formalized to Customer following the procedure in force.
All the necessary advice needs to be given to Customer as described above without tacking direct action on the Plant equipments or to the Customer operating personnel.
The Advisor need also to propose all the Plant modification / improvement, which he deem necessary to obtain better Plant availability / reliability.
If requested the Advisor need to give his advice also to identify EPC defects on newly installed equipment inside the Plant boundary.
Interface with Customer to organize as necessary flight booking, local transport, accommodation, etc. for GE personnel travelling to the Plant and do require assistance.
The Advisor need to do regular audit on Customer activities in the Plant and produce as necessary a report with the finding, highlighting areas of improvement and eventual non conformity in order to guide Customer to a continuous improvement on the O&M activities.
The report needs to be provided to GE Contract Representative for further actions with Customer.
The Advisor needs to follow the below guideline on correspondences (generally e-mails): 1)for all technical matter Advisor can correspond directly with Customer Plant Manager only.2)All contractual matter need to be discussed and agreed with GE Contract Representative, which will take the necessary actions to Customer top management.
The Advisor need to follow here below documentation guideline with Customer and relevant filing has to be properly done for future reference:
• Customer production daily report, weekly report, monthly report, to be review and filed, actions to be done as necessary.
• GE daily report prepared by Mark V Specialist Advisor need to be filed and sent daily to GE Contract Representative.
• MOM (Minute of Meeting), to be sent to GE Contract Representative and filed.
• TAN (Technical Advising Note), to be issued as necessary to Customer, to be signed by Advisor and by Customer Plant Manager, to be filed.
• Customer Incident Report, to be review and filed, actions to be done as necessary.
Август 2007 — Ноябрь 2009
2 года 4 месяца
“General Electric” Power Services
Mechanical Field Engineer, Mechanical Technical Advisor
Providing Technical Assistants Support for customer during equipment Installation & Maintenance
During Installation Job working with customer’s installation group to check correct assemble of all component of the equipment and piping component by GE procedures and standards.
During Maintenance Job working with customers group. Supervising job if on the customer site working GE maintenance group. Following all GE procedures and standards during the all types of inspections, filling all record, making inspection report for the customer and GE Engineering group.
Июнь 2007 — Август 2007
3 месяца
“KazStroyService”
Уральск, kazstroyservice.com/
Planning & Reporting Engineer of the Design Management Group
Development of the network schedules with use of Primavera Project
Planner enterprises and Microsoft Project software products and plans in the
project execution
Resource targets analysis and process control in the project execution
Control of the work progress and fulfillment of the contract conditions
Construction outputs information collection, arrangement and evaluation
Presentation materials preparation
Development of the reporting procedures and forms
Development of development plans of capital investments, budgets and costs
Cooperation with the Customer in settlement issues on the amounts\scope of
works completed.
Июнь 2005 — Июнь 2007
2 года 1 месяц
«PFD International» LLC
Атырау
SGP Design Field Supervisor
• Function as a project engineer to support construction. Working at the construction site.
• Assisting in providing technical support, expertise, analysis, and recommendations to resolve conflicts in plans and specifications.
• Assisting the Area Field Engineer as the interface between engineering and the contractor.
• Included to review RFI’s (Request for Information) from the contractors and working with the Field Engineering group and Project offices to get a response.
• Included to review RFI’s and NCR’s (Non-Conformance Report) for their impacts to the project and determine which impact the design and include these in the Authorship Supervision logs.
• Verify construction conforms to all applicable specifications, codes and standards.
• Resolve engineering design queries and issues in the field.
• As the project engineer to facilitate technical expertise, to ensure conformity between design and technical decisions.
• To ensure correspondence of construction works to the design requirements and drawings, conformity with GOSTs and SNiPs, Technical Conditions, quality control of construction and installation works.
• Quality control and assurance of materials, structures and instruments, and their storage.
• Monitoring of RFIs and NCRs , determining their impact on the existing design , supplementation of new decisions
• To register deviations from the existing design in the authorship supervision log.
• To participate in commissioning of crucial structures.
• To participate in testing, pre-commissioning and commissioning of construction systems.
• To compile concealed work witness acts.
• To monitor preparation of site as-built documentation
• To monitor Client’s technical supervision
• To monitor the work of contractor’s construction laboratory and surveyors
Сентябрь 2004 — Июнь 2005
10 месяцев
«PFD International» LLC
Атырау
Area Field Engineer Assistant
•Coordinating external and internal interfaces to ensure effective working relationships between project organizations and preventing the disruption or delay of construction activities.
•Working closely with Design Engineering, Materials Management, Planning / Scheduling, Suppliers and Contractors to contribute to the availability of design information and construction materials and services to support the project schedule.
•Coordinating and expediting design documents from design engineering offices.
•Requesting Design Engineering to review, comment on and approve supplier drawings designated to be done in the field.
•Coordinating interdisciplinary engineering activities, including field-engineering, inspection, and testing support (when not performed by quality inspectors), and confirming as-built information in timely manner.
•Supplementing design drawing for such items as field fabrication, pipe layout, isometrics, spool sheet, and concrete placement sequences with detail drawings and sketches.
•Performing evaluations for construction equipment to assist construction supervision in selecting and obtaining equipment that is best suited to meet project needs.
•Interpretation the technical requirements of the design document to provide clear understanding and proper implementation of requirements.
•Participating in and supporting the Site Safety program through safety considerations in the design program.
•Distributing and filling design documents, procedures, instructions, and Supplier information.
•Preparing requisitions for materials and designated to be purchased by field engineering in the field, and monitoring inventories to support the activities thereof.
•Interpreting the project engineering and technical requirements for PFD and Contractor project personnel including tracking and resolution of RCIs (Requests For Clarification Or Information) and FCRs (Field Change Requests) in a timely and clear manner.
•Coordinating with the Client Representatives and other third parties to promote compliance with job requirements.
•Supporting the Test Turnover Plan by preparing punch lists, coordinating turnover requirements, and preparing required test and acceptance documentation.
•Reviewing as-built drawings submitted by the contractors.
Май 2004 — Июнь 2004
2 месяца
TCO PCD TENGIZ
Атырау
Production Engineer
•Worked as a deputy head of engineering department; processing engineering documentation.
Duties:
•Work with design documentation, verification of client’s drawings for discrepancies, preparation of weekly civil progress reports for client, attendance of weekly meeting with client.
•Cost estimating, preliminary cost estimating for Bids, checking of the performed work against different forms, materials requisitions, purchase orders, work execution schedules, material planning for new buildings, calculations.
•Cost estimates of contractor drawings
Major contractors: TCO, PFD
Cost estimates begin with division of scope of work into separate sections, each estimated separately and the total added up. The sections are also separated and estimated according to disciplines, with the total added up. Cost estimation is determined by SNiPs. Specific SNiPs cover each type of work and provide ratios for scope of work cost estimates
Июнь 2002 — Март 2003
10 месяцев
KKTS LTD “KENTECH KAZAKHSTAN TECHNICAL SERVICAS LTD”
Аксай (Казахстан), www.kentech.co.uk
Material controller, storekeeper
Duties:
•Estimate of requisition for material, acceptance of material and equipments and its delivery.
•Interpretation of the technical requirements to provide clear understanding and proper implementation of requirements.
•Quality control inspection
Июнь 2000 — Июнь 2002
2 года 1 месяц
“CCC – Saipem”
Аксай (Казахстан)
Interpreter
Duties:
•Interpretation the technical requirements to provide clear understanding and proper implementation of requirements
•Worked as a scaffolding foreman
Август 1999 — Июнь 2000
11 месяцев
Secondary school #3, Aksai town
Аксай (Казахстан)
Teacher of economy
Teaching of the principles and economy bases to pupils of averages and senior classes
Обо мне
I have more than 13 years of experience in Oil & Gas area started as site interpreter and currently acting as Project Manager. Completed several biggest projects in KZ from beginning to Start-up to operation and Maintenance. Can work with international personnel as team player and as team leader equally.
Высшее образование
2010
Educated in USA in Rolls-Royce Training Center
Power Energy, Gas Turbine, Steam Turbine Plant and Engines
2008
General Electric Learning Center
Power Energy, Gas Turbine, Steam Turbine Plant and Engines
2004
West Kazakhstan State Univercity
Transport & Storage of Oil & Gas, Mechanical Engineering Technology
1999
West-Kazakhstan Humanitarian University
Generally technical disciplines, « Labor & Business »/ Teacher of economy
Знание языков
Гражданство, время в пути до работы
Гражданство: Казахстан
Разрешение на работу: Беларусь, Казахстан, Россия
Желательное время в пути до работы: Не имеет значения