Больше информации по резюме будет доступно после регистрации

Зарегистрироваться

Candidate

Male, 44 years, born on 16 September 1980

Egypt, I want to relocate (Azerbaijan, Angola, Bahrain, Egypt, Iraq, Kazakhstan, Qatar, China, Kingdom of Saudi Arabia, Kuwait, Kyrgyzstan, Libya, Nigeria, UAE, Oman, Republic of Madagascar, Russia, Tajikistan, Turkmenistan, Uzbekistan, South Africa, South Korea), prepared for business trips

Senior Electrical Engineer

6 000  in hand

Specializations:
  • Design engineer

Employment: full time, project work, work placement

Work schedule: full day, rotation based work

Work experience 22 years 11 months

February 2018currently
7 years 3 months
Eniprogetti

www.eni.com/enipedia/en_IT/financial-corporate-reporting/subsidiary-associated-companies/eniprogetti.page

Construction, Real Estate, Architecture... Show more

Senior Electrical Engineer
Project: Zohr Development Project, US$13 billion, Petrobel, EGYPT. • Zohr development project consists of new Greenfield Gas Processing Facilities for treating gas delivered from subsea wells with nominal 2800MMSCFD of export Sales Gas at zohr site in Port Said. • Responsible for all electrical engineering activities, including review and approval of project’s electrical engineering documentations prepared by the engineering contractor (Enppi) and technical evaluation for vendors offers, rule extended to lead site engineering electrical team at Zohr onshore site.
June 2016February 2018
1 year 9 months
Petrofac

Kuwait, www.petrofac.com

Oil and Gas... Show more

Electrical Superintendent
Project: Lower Fares Heavy Oil Development Project, US$4 billion, Kuwait Oil Company, KUWAIT. • Lower fares heavy oil development project located in the north of Kuwait, the EPC scope of work covers greenfield and brownfield facilities for the main central processing facility (CPF) and associated infrastructure as well as the production support complex, when fully operational the initial phase of the project will produce 60,000 barrels of oil a day. • Responsible for all electrical construction activities/subcontractors throughout all construction phases to ensure the integrity of work scope and all electrical works is carried out in accordance with project drawings, specifications, quality requirements and project schedule.
June 2015June 2016
1 year 1 month
Toyo Engineering

Egypt, www.toyo-eng.com

Construction, Real Estate, Architecture... Show more

Electrical Superintendent
Project: Ethylene Plant, US$600 million, Ethydco, EGYPT. • EPC contract to build a 460,000 T/Y ethylene plant and a 20,000 T/Y butadiene extraction plant as part of Ethydco's petrochemical complex in Alexandria, Egypt. • Responsible for the electrical commissioning and start-up activities related to the ethylene plant and butadiene extraction plant; successful startup of the plant achieved.
June 2004June 2015
11 years 1 month
Saipem S.p.A.

Kazakhstan, www.saipem.com

Construction, Real Estate, Architecture... Show more

Senior Electrical Engineer / Electrical Superintendent
Senior Electrical Engineer / Electrical Superintendent (2004 - 2015) Project 1- Kashagan Offshore Field Development, US$50 billion, AGIP KCO, KAZAKHSTAN. • Kashagan field is an offshore oil field in Kazakhstan's zone of the Caspian Sea; it is estimated that the Kashagan field has reserves of about 13 billion barrels of crude oil recoverable with the use of gas re-injection. the gas contains huge volumes of associated gas with highly toxic and corrosive hydrogen sulfide (H2S) concentrations of 18-20%. Phase-1 with target production of 370,000 barrels a day. • Onshore role: responsible for electrical activities related to execution of the project which encompasses site engineering, procurement (technical evaluation) and equipment installation. All electrical equipment installation and onshore fabrication works were performed in the newly developed ERSAI yard which I participated in its design and construction; Yard occupies total area of 2.2 km2; Yard Facilities include power generation units complete with HV electrical grid connection, fabrication area, maintenance shops, jetty, water treatment plant, desalination plant and accommodation area (including recreation facilities) for 2,300 people • Offshore role: responsible for supervision of all electrical works associated with offshore Hook-up and commissioning of offshore facilities. Project 2- OML 58 Upgrade Project, US$3 billion, Total E&P Nigeria Limited, NIGERIA. • The OML 58 Obite gas treatment plant has been on stream since December 1999. The OML 58 upgrade project is designed to increase gas production capacity from 10.6 million cubic meters per day to 15.6 million cubic meters per day, and also increase oil and condensate output by around 15,000 barrels per day bringing the total output to 140,000 barrels of oil equivalent per day. • Responsible for all electrical works associated with construction and commissioning of new gas treatment train in Obite Gas Plant. Project 3- Husky Sunrise Oil Sands Central Processing Facility, US$4 billion, Husky Energy, Canada. • The CPF is located 60km north of Fort McMurray-Alberta, use steam assisted gravity drainage (SAGD) technology to recover the bitumen and will produce 60,000 barrels per day. • Responsible for the supervision of all electrical construction, pre-commissioning and commissioning works performed by the electrical subcontractors, all construction and commissioning activities for phase-1 has been successfully completed. Project 4- Construction of Keppel KFELS B Class Jackup Drilling Rig, US$320 million, KazMunaiGas JSC, KAZAKHSTAN. • The Keppel KFELS B Class Jackup Rig is highly efficient drilling platform incorporates advanced and fully-automated high capacity rack, pinion elevating system and self-positioning fixation system. • Responsible for all electrical construction activities related to the fabrication, outfitting and commissioning of the drilling rig, All construction and commissioning activities has been completed. Project 5- Khurbet Crude Oil Central Processing Facility, Gulfsands Petroleum, SYRIA. • The Central Processing Facility with the capacity to process 50,000 barrels per day to be installed at the Khurbet East oil field, on Block 26. • Responsible for the Front-End Engineering Design (FEED) for electrical engineering scope including power generation, distribution network, purchase specifications and selection of equipment, design activities performed in saipem’s office at VIBO VALENTIA – ITALY.
June 2002June 2004
2 years 1 month
Pan Emirates Engineering -Abu Dhabi - UAE

UAE

Construction, Real Estate, Architecture... Show more

Electrical Design Engineer
Project - Upgrade of Jabel Dhanna Crude Oil Tank Farm Facilities, Abu Dhabi Company for Onshore Oil Operations (ADCO), UNITED ARAB EMIRATES. • Responsible for the Conceptual and Detailed Engineering Design of the Electrical Scope.

Skills

Skill proficiency levels
Электрические сети
Строительство
Нефтегаз

Driving experience

Own car

Driver's license category B

About me

Over 16 years of working experience in Electrical Engineering, Construction and Commissioning in oil and gas EPC contracts; worked in onshore and offshore sites for both green and brown field projects in Canada, Nigeria, Kazakhstan, Italy, Kuwait, Syria, UAE and Egypt.

Higher education (bachelor)

2002
Bachelor of Science in Electrical Engineering
Electrical Engineering, Bachelor of Science

Languages

ArabicNative


EnglishC2 — Proficiency


RussianC1 — Advanced


Professional development, courses

2013
BOSIET
OPITO, basic offshore safety induction and emergency training

Citizenship, travel time to work

Citizenship: Egypt

Permission to work: Egypt

Desired travel time to work: Up to 90 minutes